
Features & Archives » Mercury (Station) Bridge Repairs 2000 - 2001
Home/Background | Summary | Back to Archive List
Archive July 2001
The south Riverbank - work has been completed 18/07 Top - The new Kissing Gates installed on the south side of the River bank, which forms part of the Coast to Coast Walk - Top Right - The cleared site, on the south side of the River. Left: The repaired bridge under the south arch Right: The new central pier Left: The water outfall on the north side of the river - work is to be carried out to stop any potential damage to the bridge. The outfall was allegedly a big contributor to the collapse of the central pier. This work is to be carried out by Yorkshire Water and JN Bentley of Skipton. |